Before you build

Good questions.
Better conversations.

A short reading list for the decisions ahead. Explore the details when you need them.

01

ADU financing questions

Before you accept a no-payment or escrow-based ADU offer, make sure you know when interest begins, what amount it applies to, and whether unresolved property issues could still create change orders later.

Read the guide

02

Preparing for permit review

Property questions, incomplete plans and outstanding clearances can add work during review. Understanding them early helps you have a more useful conversation with your designer before submitting plans.

Read the guide

03

Unknown expenses

A construction quote is easier to compare when you can see the assumptions behind it. Ask which property conditions have been checked and which costs still depend on design, inspection or agency review.

Read the guide

04

Your existing sewer line

An ADU may be able to share the existing private sewer, subject to its condition, capacity, approved connection design and applicable City requirements. Ask a qualified plumbing professional to assess the proposed connection before relying on it.

Read the guide

05

Public sewer capacity

Your property's sewer pipe and the city's sewer system raise different questions. A workable plumbing route still needs to be considered alongside the city's requirements for accepting the proposed sewage flow.

Read the guide

06

Ceiling heights in a conversion

For a garage or other building conversion, ask your designer to check the space that will remain after the proposed floor, ceiling and building services are installed.

Read the guide

07

Could trees affect your ADU plans?

Trees can influence where an ADU fits and how construction equipment, foundations and utility lines reach it. Checking them early can help avoid unexpected costs and design changes.

Read the guide

08

Is additional parking required?

Many Los Angeles ADUs qualify for a parking exemption. Check the ADU's approval category, the walking route to public transit and the other exemptions before changing your site layout to add a space.

Read the guide

Start with your property.

One independent Property Feasibility Report. Personally reviewed. $79.