Inside your Property Feasibility Report

Know what your report covers.

Property-specific findings, plain-language explanations and useful questions to take to your contractor or designer.

01

Your property information

The property and ADU type being reviewed, with relevant parcel, zoning and site information.

02

Understanding the colors

What the four finding colors mean, and why a finding status is different from your overall complexity grade.

03

Your overall results

Your overall complexity grade, the reasons behind it, and the property-specific concerns or unknowns that need attention.

04

Space for your ADU

How visible structures, pools, trees and open areas may affect placement, and what your contractor or designer needs to verify.

05

Zoning and planning

Zoning, setbacks, height and applicable planning questions for the ADU type you are considering.

06

Parking and access

Parking and access considerations to discuss before settling on an ADU layout.

07

Site and environmental conditions

Relevant fire, hillside, ground, flood and environmental considerations, with material concerns and unknowns explained.

08

Utilities and drainage

Potential sewer, water, power, energy and drainage questions, including checks that belong at design stage.

09

Permit steps and cost drivers

Potential approval steps, fees and property conditions that may affect construction costs. The report is not a construction estimate.

10

Questions and review limits

Useful next questions for your contractor, designer or agency, with the review’s scope, dates and unresolved information clearly stated.

Topics are grouped to suit your property within the standard 10-page report. An additional page may be used for important findings or readability.

Understanding findings and complexity

First, read the finding. Then, the next step.

The color describes an individual finding. The overall complexity grade is a separate summary of the project’s material issues; it is not an average of the finding colors.

No issue identified
Green: the reviewed evidence identifies no issue for this item.
Condition to address
Yellow: a known condition may affect design, placement or cost.
Verification needed
Orange: missing or conflicting information needs follow-up. A missing photo or minor detail is not an automatic failure.
Specific option not allowed
Red: a verified requirement rules out the specific option being evaluated. Missing information alone does not make a finding red.

The overall A–D grade describes project complexity. An overall D means major complexity; it does not by itself mean an ADU is prohibited. Routine engineering and utility calculations remain design-stage work. A provisional grade may change when important facts are confirmed.

The redesigned sample simplifies how findings are presented. It does not change the rules used to assess a property.

An informational review of available data. Not a site inspection, survey, engineering assessment, title search or approval to build. It does not guarantee savings or a construction price.