Confirm the city review
What does city sewer capacity review mean for your ADU?
Your property's sewer pipe and the city's sewer system raise different questions. A workable plumbing route still needs to be considered alongside the city's requirements for accepting the proposed sewage flow.
Ask which review applies to the project.
LADBS's ADU and JADU bulletin identifies a Bureau of Engineering sewer-availability clearance. Some projects meeting the city's conditions can be approved by the district office without a Sewer Capacity Availability Review, or SCAR. Ask which process and supporting information your proposal needs.
A SCAR evaluates capacity in the existing public sewer collection system. It does not inspect the condition of the property's private pipe or approve every part of the plumbing design.
References: LADBS ADU and JADU bulletin, Section VI.B and Bureau of Engineering sewer review procedures.
Keep a record of the answer.
- Project details. Does the application accurately describe the existing uses, proposed ADU and intended sewer connection?
- Required review. Which sewer clearance, capacity review or connection permit applies, and who will prepare the submission?
- Current status. Is there a written response for this proposal? What conditions, corrections or further information remain outstanding?
- Design changes. If the unit, use or connection location changes, does the city need to review the revised proposal?
- Budget and schedule. If additional work or review is identified, who will explain its effect before the construction price and schedule are finalized?
Do not treat an existing connection, a nearby sewer line or a general description of review fees as confirmation of capacity or approval for your project.